WES_referat_2013
  • blank
  • english version
  • blank

PROJECTS 2019

foto1 projects 2019  

WES Consulting Company in 2019 developed a number of topics on behalf of collaborating institutions.

We invite you to familiarize yourself with the most important studies of our Company and a summary is shown below.

We also present
our scientific and technical articles:

List of the most important studies made by us in 2019:

  1. Verification translating dictionary - Dictionary of Petroleum Exploration, Drilling and Production Second Edition.
    The agreement with the INiG-PIB in Krakow

  2. Verification and reviewing articles and scientific - technical to the monthly "NAFTA-GAZ" - an agreement with the INiG-PIB in Krakow

  3. Participation in the meetings of the examination committee appointed by the Director of the District Mining Office in Warsaw - approval of occupational exams.

  4. Preparation of a report on technical problems of running and cementing 7" liners in the Dzieduszyce-11K and Międzychod-8H wells. Guidelines for the development of an internal instruction for running and cementing liners at EXALO DRILLING SA

  5. Preparation of guidelines for the contract for the supervision of the function of the Supervision Inspector so called Company Man as part of projects implemented by EXALO DRILLING SA and supervision in the Organization of the Mining Plant (Organizacja Ruchu Zakładu) exercised by EXALO DRILLING SA

  6. Preparation of assumptions and proposals for the new mining organizational structure of EXALO DRILLING SA in the light of proposals for organizational changes developed by Grant Thorton Company.

  7. Development of planning, running and cementing procedures for LINERS at EXALO DRILLING SA. Workshops with the participation of EXALO DRIILING SA

  8. Development of procedures and templates of agreements "A" and "B" regarding the principles of cooperation in operations and supervision of works performed by EXALO DRILLING SA

  9. Development of the mining plant scheme for EXALO DRILLING SA in connection with the current organizational chart for approval by the Management Board of EXALO DRILLING SA

  10. A study titled "Assessment of the supplied 7" x 10.36 mm, N-80 pipes by UNITOL for the completion of KPMG Kosakowo caverns, taking into account the supplementary analysis carried out by AGH at the request of the Court of Appeal in Warsaw" - commissioned by Gas Storage Poland Sp. z o.o.

  11. Training as part of the Future Manager Academy Programme for employees of EXALO DRILLING SA

  • Topic 1 - "Technology and technique for drilling using the MPD method"

  • Topic 2 - "Procedures for preparing, making up and running casing and production pipes with PREMIUM connections-threads"

  • Topic 3 - "The use of snubbing technology in Poland"


  foto6 projects_2019
 
foto1 projects_2019
 
foto2 projects_2019
 
foto5 projects_2019
 
foto4 projects_2019


Our scientific and technical articles in 2019:

  1. "Procedures and guidelines for planning, running and cementing LINERS" - 3 parts of the article published in Wiadomości Naftowe i Gazownicze.

  2. "MPD Managed Pressure Drilling. The use of MPD technology in pressure management and control during drilling" - an article published in Wiadomości Naftowe i Gazownicze.

Valid CSS!space
spaceValid HTML!

space Copyright © WES, 2004 - . All Rights Reserved. space

go to top